Coastal resort suites
New fit-outMid-sizeSeafront · location placeholderIllustrative placeholder case study
A new-build suite wing fitted out from shell to opening day.


Drag, swipe or use the arrow keys · renders are placeholders
Project facts
- Scope · illustrative
- 4,500 m²
- Duration · illustrative
- 11 months
- Rooms · illustrative
- 64 suites
01
The challenge
A shell-and-core building, a fixed opening date and FF&E with long overseas lead times.
02
Our approach
Design frozen early, FF&E ordered during construction, and suites installed and snagged in batches of eight to protect the opening.
03
The outcome
Suites handed over in sequence, ready for the operator's pre-opening inspections.
Gallery
Placeholder renders