Process
One room, from first survey to first guest.
Scroll through a typical engagement. The same guest room moves from its existing condition to drawings, approvals, construction, furnishing and handover.
- Stage 1: Consultation. We walk the property with you, listen to what's working and what isn't, and agree what success means — rate, guest scores, opening date, budget. Deliverables: Site visit & first survey, Brief and success criteria, Order-of-magnitude budget.
- Stage 2: Design & Concept. The concept becomes plans, elevations, lighting and specifications — then a full-scale mock-up room you can sleep in before anything is rolled out. Deliverables: Concept & material boards, Drawings and specifications, Mock-up room sign-off.
- Stage 3: Permits & Planning. We prepare and coordinate the approvals, lock the programme and the price, and plan the phasing that keeps your hotel trading during works. Deliverables: Permit applications & approvals, Fixed programme and budget, Phasing & logistics plan.
- Stage 4: Construction. Strip-out, structure and services, coordinated floor by floor — with weekly reporting on programme, cost, risks and the decisions we need from you. Deliverables: Weekly one-page report, Quality inspections, Change control before change.
- Stage 5: Furnishing & Styling. FF&E ordered months earlier arrives in sequence. Rooms are installed, styled and snagged in batches, ready for the operator's inspection. Deliverables: FF&E installation, Styling & art, Room-by-room snagging.
- Stage 6: Handover. Keys, documentation and training for your team — and we stay on through the defects period, because opening day is not the end of the job. Deliverables: O&M manuals & warranties, Team training, Defects-period support.
Throughout
What stays constant at every stage.
01
One weekly report
Programme, cost, risks and the decisions we need — on one page first, in plain language.
02
Change before change
Every change is priced and approved before it is built. The budget moves only when you decide.
03
Trading hotels
Phasing, noise windows and segregated access, planned with your general manager.
04
Documented quality
Inspections at every stage and a full handover file: drawings, manuals, warranties, certificates.
Start with stage 01
Site visit & first survey · Brief and success criteria · Order-of-magnitude budget