Skip to content
Guest room, existing condition before renovation (illustrative placeholder render)
Guest room, after renovation in the Urban Boutique direction (illustrative placeholder render)
BeforeAfter

Hotel renovation & fit-out contractor

SimfonieWe give shape to a new beginning.

Design, construction, FF&E and project management under one contract — so the transformation is ours to deliver, and the sleepless nights aren't yours.

01 / 04 · Guest room · full renovation

Explore a direction

Same room. Three very different hotels.

Every project starts by finding the right character for the property and its guests. Pick a direction and watch the room — its palette, materials and light — change with it.

Guest room, after renovation in the Urban Boutique direction (illustrative placeholder render)

Dark, tactile and quietly theatrical

Smoked oak, charcoal plaster, brass and oxblood leather. Intimate rooms with strong character — the kind of place guests tag before they've unpacked.

Palette

  • Charcoal plaster#2B2A29
  • Smoked oak#5A4532
  • Aged brass#B08D57
  • Oxblood#6B2B2B
  • Warm stone#B9AE9C

Materials

  • Smoked oak
  • Aged brass
  • Oxblood leather
  • Charcoal plaster
  • Layered lighting
  • Rich textures
  • High contrast
  • Statement joinery

LightingLow, directional, dimmable — every lamp placed for a reason.

How an engagement runs

Six stages. One programme. No surprises you hear about last.

  1. Stage 1: Consultation. We walk the property with you, listen to what's working and what isn't, and agree what success means — rate, guest scores, opening date, budget. Site visit & first survey, Brief and success criteria, Order-of-magnitude budget.
  2. Stage 2: Design & Concept. The concept becomes plans, elevations, lighting and specifications — then a full-scale mock-up room you can sleep in before anything is rolled out. Concept & material boards, Drawings and specifications, Mock-up room sign-off.
  3. Stage 3: Permits & Planning. We prepare and coordinate the approvals, lock the programme and the price, and plan the phasing that keeps your hotel trading during works. Permit applications & approvals, Fixed programme and budget, Phasing & logistics plan.
  4. Stage 4: Construction. Strip-out, structure and services, coordinated floor by floor — with weekly reporting on programme, cost, risks and the decisions we need from you. Weekly one-page report, Quality inspections, Change control before change.
  5. Stage 5: Furnishing & Styling. FF&E ordered months earlier arrives in sequence. Rooms are installed, styled and snagged in batches, ready for the operator's inspection. FF&E installation, Styling & art, Room-by-room snagging.
  6. Stage 6: Handover. Keys, documentation and training for your team — and we stay on through the defects period, because opening day is not the end of the job. O&M manuals & warranties, Team training, Defects-period support.

In numbers

Built on delivery, not adjectives.

Hotel projects delivered
40+
Guest rooms renovated
2,400
Transformed
85,000 m²
Years of combined team experience
60+

Illustrative placeholder figures — to be replaced with verified numbers.

From owners & operators

What it feels like on the client side.

For the first time in a renovation, I had one weekly report and one person to call. The hotel kept trading the whole way through.

OwnerBoutique city hotel · illustrative placeholder

Also for housekeeping

We supply cleaning products for hotels

From laundry detergents to disinfectants and in-room hygiene products — professional supplies for the teams that keep the hotel spotless.

See the cleaning supplies
  • Liquid laundry detergent

    Liquid laundry detergent

  • Powder laundry detergent

    Powder laundry detergent

  • Laundry detergent capsules

    Laundry detergent capsules

  • Fabric softener

    Fabric softener

Start a conversation

Thinking about a renovation?

Tell us about the property and what you're trying to achieve. A senior member of the team replies within two working days with first thoughts and the right next step.

Studio

Symphony Urban Living SRL

Str. Moților nr. 16, Sector 3

București, Romania

Monday – Friday, 09:00 – 18:00 (EET)

Symphony Urban Living — Hotel renovation & fit-out, delivered turnkey